Notifications
Clear all
Topic starter
Finally installed Crystal Server 2013, to schedule Crystal Reports (built with pre-2013 Crystal Reports) for the EMR environment. All appears correct, but something has got to be missing or incorrect since I keep getting errors.
So, with my pre-2013 designed reports, I get -- Failed to open the connection. ~tmpcec9006c8439b0.rpt
But, since I bought/installed CR2013, I can update existing definition files and re-save. But these generate -- Destination disabled. []: [CrystalEnterprise.Smtp]. Please note the name of the job server used for your request and contact your system administrator to make sure the specified destination is enabled. (FWB 00031)
Anyone have thoughts on what to look at?
Posted : August 8, 2016 4:23 am