We are currently running CPS 12.0.9 with Patch 1. Before we upgraded we were on 12.0.6.
We had log shipping set up to a secondary server for fall back / reporting purposes, this all worked fine before the Service pack.
has any one successfully set up Log Shipping with your CPS database? If so did you also use the nightly backup jobs? My thought is the job in SP 9 is some how doing something with the logs that breaks my chain.
thanks,
Josh
I'm not doing a full log shipping setup but I have a pretty slick system setup to take log backups every 15 minutes 24/7 while also doing a full backup every night and also save restore scrips to make disaster recovery restoration easier.
Did you have the default GE job changed before? My guess is inline with yours and the problem might be that the GE job is rolling a log backup into the full backup as the last step.
Ahh got it. You might need to remove the step BACKUP CPO LOG from the default backup job.
Thanks @Bovie I appreciate the answers. This is the answer I came to as well, the nightly lock backup / truncation from the GE job was breaking logshipping because it was unable to find that particular logfile backup.
No problem, glad I could help.